With an architectural height of 220.67 metres, Olszynki Park is setting new benchmarks in Polish high-rise construction. The project takes the lead from the previous record holder, Wrocław Sky Tower (212 metres). The exposed building height, construction volume and sophisticated architecture required anchoring solutions with maximum load-bearing capacity. Mechanical and chemical fastening systems from fischer ensure permanent load transfer in a range of substrates and reliably protect the building structure against dynamic forces.

„The choice of fastening technology is far more than an execution detail – it is a key safety factor for the entire structure. That is why the companies responsible chose our proven systems, which are used wherever reliability and the consistent implementation of the plans are top priorities.“ says Artur Hoffman, Country Manager of fischer Poland.

Large-scale projects can only succeed through reliable interfaces between manufacturers and installation companies. The executing company Reconal has been working closely with fischer for over a decade. Roman Kotuła, Project Manager at Reconal, reveals: „Two factors are decisive for us when choosing fischer: the high quality of the products and the comprehensive technical support – from installation optimisation to the assistance provided by fischer engineers with complex technical calculations.“ The close integration of both partners made a significant contribution to accelerating work processes and implementing the required quality standards on schedule.

At great heights, enormous wind forces act on the façade. The direction and intensity of the loads vary continuously. Pressure and suction forces place particular stress on façade elements and the areas between floors. Every anchorage must safely transfer these changing horizontal loads into the load-bearing structure. Faulty fixings pose significant risks to the building fabric and the surrounding urban space. fischer systems provide the required structural safety throughout the entire service life.

Due to the different construction materials in the structure, two specialised fischer fastening solutions were used.
Secure heavy-duty anchoring in reinforced concrete: The project managers selected the FAZ II Plus bolt anchor for load-bearing connections in concrete. The proven expansion anchor carries the full load immediately after installation. Its European Technical Assessments (ETAs) guarantee maximum installation safety. Thanks to numerous diameter variants and anchorage depths, the system adapted flexibly to the structural requirements.
Expansion-pressure-free load transfer in aerated concrete: Due to its porous structure, a chemical system was suitable for aerated concrete. The FIS V Plus universal injection mortar fills the drill hole completely without voids. After curing, the mortar forms a high-strength bond with the construction material. This prevents expansion pressure in the porous base material, protects against edge breakouts and offers high resistance to dynamic loads and vibrations.

With a high-rise building of this scale, there is no room for chance.
Standardised fastening solutions make everyday work on construction sites considerably easier. Structured technical documentation, clearly understandable installation instructions and coordinated tools reduced the installation effort at Olszynki Park. The installation teams were able to carry out anchorages quickly, without errors and in a verifiable manner. This reduced installation times and ensured the project progressed on schedule.