Heavy traffic, narrow and winding roads and potential dangers such as storms and forces of nature place high demands on the safety of the Gotthard Pass Road. Under the leadership of the German Federal Roads Agency ASTRA, construction planners and contractors have been able to master the renovation under these difficult conditions precisely on schedule. At the same time, the sophisticated project management of ASTRA regulates the continued flow of traffic on the important link between the north and south of the Alps.
Since April 2017 the renovation of the Tanzenbein (middle and south sections) and Brüggwaldboden galleries as well as the Fadegg tunnel has been planned. These structures protect road users from stone chipping, rock falls and mainly from avalanches. The existing roof has been reinforced to increase the safety of the Tanzenbein Gallery. For this purpose, 1,900 fischer FCC-A concrete-to-concrete push fasteners, consisting of anchor rod and special nut, were used on 250 square metres. The spacing was 25 and 35 centimetres apart, depending on the direction. First, the concrete workers of the responsible construction company Implenia drilled holes in the old concrete to the specified dimensions. After careful cleaning of the borehole, they filled it with the 2-component injection mortar FIS V. They then manually inserted the FCC-A into the injection mortar up to the bottom of the borehole. After a short curing time, these fasteners are fully resilient and now absorb and reliably transfer the tensile and shear forces that occur in the joint between old and new concrete.